Meadowcliffe Drive Erosion Control Project

Toronto and Region Conservation Authority (TRCA) undertook remedial erosion control works along a portion of the Scarborough Bluffs at the Lake Ontario shoreline, in the City of Toronto. The project site spanned approximately 600 m of shoreline between Bluffers Park and Bellamy Ravine (also known as Gates Gully).

Notice Minor Maintenance Works

Please be advised, Toronto and Region Conservation Authority is undertaking minor maintenance works due to a recent landslide along a section of the Scarborough Bluffs located immediately below Sylvan Avenue and Meadowcliffe Drive and is expected to be completed by Friday June 5, 2015. The community can continue to access the waterfront through these maintenance works.

For more information regarding the mainentance work, please contact Lindsay Prihoda, Project Manager by telephone (416) 407-1754 or email lprihoda@trca.on.ca.

Project Completion

Toronto and Region Conservation Authority (TRCA) is pleased to announce that substantial completion of the Meadowcliffe Drive Erosion Control Project has been achieved.  As the site stabilizes, future on-site works will include native plantings and installation of critical wildlife structures such as nesting boxes to support wildlife habitat development.  dditional restoration of the beach located between Bellamy Ravine and Sylvan Avenue shoreline protection will also be completed. This work is currently scheduled in 2015.

TRCA staff have been monitoring the condition of the constructed remedial works and will continue to do so on a regular basis during this first year following construction, and at least annually thereafter, to ensure that these works are functioning as designed and that any deficiencies are identified for maintenance work in a timely fashion, as funding permits. 

For more information on the Meadowcliffe Drive Erosion Control Project please contact:

Mark Preston,
Senior Construction Supervisor                                   
Toronto and Region Conservation Authority                               
Phone: 416-392-9722                                                           
Email: mpreston@trca.on.ca 

Project Planning

The planning and design process for this project was completed under a Class Environmental Assessment, and the decision making process used to select the preferred course of action was documented in an Environmental Study Report, which is available below:

Meadowcliffe Environmental Study Report (5.4MB pdf)
Meadowcliffe Environmental Study Report - Appendices (29.9MB pdf)

Meadowcliffe Erosion Control Project - Post Construction

 

Meadowcliffe Erosion Control Project - Post Construction

 

Meadowcliffe Erosion Control Project - Post Construction